Underwater Excavations
Breaching the seabed. Operating heavy machinery hundreds of meters below sea level with thousands of tons of hydrostatic pressure pressing down.
The Threat of Inundation
When tunneling beneath a body of water, the primary enemy is not rock, but water. In projects like the Seikan Tunnel in Japan or the Channel Tunnel between the UK and France, the rock strata acts as the only barrier between the machine and the ocean floor.
Immersed Tube vs. Bored Tunnels
There are two primary methods for underwater crossings. The first is trenching the seabed and sinking massive pre-cast concrete sections (Immersed Tube Tunnels). The second is utilizing a Slurry Shield TBM. A slurry machine pipes pressurized bentonite clay fluid to the cutterface. This fluid counter-balances the groundwater pressure, preventing the ocean from collapsing the bore, and mixes with the excavated material to be pumped back to the surface.
Bored through highly fractured volcanic rock 240 meters below sea level. Required extensive forward-grouting to seal fissures before cutting.
Navigated primarily through the Chalk Marl stratum. This layer provided ideal cutting conditions and natural water impermeability.